Projects Details
Mirab Towers
· Consists of 2 hotel towers
· Location: King Fahd Road, Riyadh
· Construction duration: 8 months
· Total building area: 22,000 m²

Awaed Towers
· Consists of 1 hotel tower
· Location: King Fahd Road, Riyadh
· Architectural works duration: 10 months
· Total building area: 12,000 m²

Anan Hotel
· Consists of 1 hotel tower
· Location: King Fahd Road, Riyadh
· Architectural works duration: 8 months· Total building area: 10,000 m²

Sea View Residential Project
· Consists of 860 residential
· units Location: Al-Aziziyah District, Al Khobar
· Construction and architectural works duration: 24 months
· Total building area: 305,000 m²

Ma’ali Anan Project
· Consists of 440 residential units
· Location: Al-Janadriyah District, Riyadh.
· Construction and architectural works duration: 24 months
· Total Built-up Area: 154,000 square meters.

ALManar Roshen Project
· Consists of 100 residential units.
· Location: ALmanar Roshn , Mecca.
· Construction and architectural works duration: 24 months.
·Total Built-up Area: 26,000m².

Project Name: Ramliah Project
· Consists 108 residential units.
· Location: Al Narjis District, Riyadh.
· Construction and architectural works duration: 16 months.
· Total Built-up Area: 27,000 square meters.

Ecodan Project
· The project consists of 11 multi-story residential buildings.
· Location: King Salman Energy Park (SPARK), Buqayq.
· Construction and architectural works duration: 16 months.
· Total Built-up Area: 42,000 square meters.

Sedra Roshn Project
· The project consists of 3 multi-story residential buildings.
· Location: Sedra Roshn, Riyadh.
· Construction duration: 6 months.
·Total Built-up Area: 39,000m².

Rabiah Al-Ahsa Project
· The project Consists 16 multi-story residential buildings.
· Location: Al Oyoun District, Al-Ahsa.
· Construction works duration: 6 months.
· Total Built-up Area: 42,000 square meters.
